NovaSac
Residential Service

Kitchen Remodeling in Sacramento

NovaSac remodels kitchens for Sacramento homeowners who want more function, better flow, and a modern look. We handle every detail — cabinetry, countertops, backsplash, flooring, lighting, plumbing, and electrical — so you get a kitchen that works for your family and adds lasting value to your home.

NovaSac, Inc. BBB Business Review
4.917 Google reviews

Also on Yelp & HomeAdvisor · All reviews

Licensed CSLB #1143859 · Bonded & insured · Financing available

Kitchen Remodeling in Sacramento

Recent Kitchen Remodeling Projects

A selection of recent kitchen remodeling work completed by NovaSac across the Sacramento region.

What's Included

  • Cabinet installation — custom, semi-custom, and stock
  • Custom cabinetry design and build
  • Cabinet refacing, refinishing, and door replacement
  • Countertop fabrication, installation, and replacement (quartz, granite, marble, butcher block)
  • Backsplash tile installation
  • Flooring (hardwood, LVP, or tile)
See the full scope (4 more)
  • Plumbing for sinks, dishwashers, and garbage disposals
  • Electrical for appliances, outlets, and under-cabinet lighting
  • Island construction and modifications
  • Painting, trim, and crown molding

Cost Range

$15,000 – $75,000+

A mid-range kitchen remodel in Sacramento typically costs $25,000 to $50,000. High-end projects with custom cabinetry, stone countertops, and structural changes (removing walls, adding islands) can exceed $75,000.

Every project is different. Request a free estimate for accurate pricing on your specific project.

Our Process

  1. 1

    Consultation & Design

    We review your current kitchen, discuss how you use the space, and present layout and material options.

  2. 2

    Material Selection & Ordering

    Cabinets, countertops, tile, and fixtures are selected and ordered — we coordinate lead times to avoid delays.

  3. 3

    Permits

    We pull permits for any electrical, plumbing, or structural work required by Sacramento County.

  4. 4

    Construction

    Demo, rough-ins, cabinets, countertops, backsplash, flooring, fixtures, and paint — managed on a clear timeline.

  5. 5

    Final Walkthrough

    We walk the finished kitchen with you, test every appliance and fixture, and address any final details.

What Our Clients Say

Read all 25 reviews →
“NovaSac did an amazing job on our kitchen remodel.”

Olga A.

Kitchen Remodel

HomeAdvisor
“The team was so friendly, patient, and easy to work with.”

Adriana M.

Kitchen Remodel

HomeAdvisor
“From the very first consultation, their team was professional, communicative, and genuinely interested in understanding our vision.”

Daniela T.

Kitchen Remodel

HomeAdvisor

Frequently Asked Questions

How long does a kitchen remodel take?
A full kitchen remodel typically takes 6 to 10 weeks. Cabinet lead times (4 to 6 weeks for custom, 2 to 3 weeks for stock) are the biggest variable. We begin demolition and rough-in work while cabinets are being manufactured to keep the project moving.
Can you remove a wall to open up my kitchen?
In most cases, yes. If the wall is load-bearing, we install a structural beam to carry the load. We work with a structural engineer to verify the design and pull the required permit. Opening up a kitchen to the living or dining area is one of the most requested upgrades we do.
What countertop material is best for Sacramento kitchens?
Quartz is the most popular choice in Sacramento because it is durable, low-maintenance, and heat-resistant. Granite remains a strong option for a natural-stone look. Butcher block works well for islands and prep areas. We help you choose based on your budget and lifestyle.
Should I reface my cabinets or replace them?
It depends on the boxes and the layout. If your cabinet boxes are solid and the layout works, refacing or refinishing — new doors, drawer fronts, and matching veneer — gives a fresh look for a fraction of replacement cost. If you want a different layout, more storage, or the boxes are damaged, full custom cabinetry is the better investment. We assess both and give you an honest recommendation.

Get Your Free Kitchen Remodeling Estimate

Tell us about your project and we'll get back to you within 1 business day.

  • Free estimate
  • Financing available
  • Licensed CSLB #1143859 · bonded & insured

Prefer to talk it through?

Call (916) 999-9286

Cabinet lead times drive the kitchen remodel timeline more than any other factor. We order cabinets within the first week and schedule all other trades around that delivery date, which keeps projects from stalling mid-construction.

Common Pitfalls to Avoid

Mistakes we see homeowners and business owners make — and how to avoid them.

  • Not ordering cabinets early enough — custom cabinets take 4-6 weeks and are the single biggest schedule driver in kitchen remodels
  • Choosing appliances after the kitchen is designed, only to discover they don't fit the cabinet layout
  • Removing a wall without checking whether it's load-bearing, which can compromise structural integrity and require expensive engineering
  • Skipping the design phase to save money, then paying for change orders when the layout doesn't work during construction
  • Selecting countertop material before cabinets are installed — templates must be taken from the actual installed cabinets for a proper fit
Call NowFree Estimate